Before and after

Before and after

Saturday, 17 September 2011

Week 5 demolition goes on

Kitchen moves on with some setbacks - there was a brain-fail during installation of drawer handles that will require new drawer fronts. Annoying considering how much effort has gone in to getting the kitchen this far. Still, the chimney is down to ground floor level.

Karen is proved right again - the room does seem much wider than the 12 inches we gained.

K tries out the sun room during a sunny interval

I climbed up the scaffolding to get an idea of the view we will get from our bedroom - the windows should be here within two weeks! It is a stonking view. We have to wade through the next six weeks of pain to get our reward.