Before and after

Before and after

Monday, 15 November 2010

The micro orchard

The bed for the espaliered fruit trees went in today. Karen and I shifted soil and put up the boards on the high side. This will form the back edge of a flower bed, which Karen marked out today. We have decided on steel posts for the trees to minimise the size of the posts. Next project is pouring the floor slab for the studio, booked for next Monday, and shifting the "ramp" that was created by excavating the studio - Rob on a digger!
Top board level to within 5mm. Check it out, Tom.
Just add manure.
Bottom bed got bigger and will swallow tons of soil.

No comments:

Post a Comment